DocumentCode
2927817
Title
Electromagnetic interference (EMI) testing of electrical equipment
Author
Maughan, Clyde V.
Author_Institution
Maughan Generator Consultants, Schenectady, NY, USA
fYear
2011
fDate
5-8 June 2011
Firstpage
340
Lastpage
344
Abstract
Assessment of the condition of electric machinery in a power plant has always been difficult. The standard on-line monitoring instrumentation is particularly deficient on generators. Specialized devices can be added to improve capability somewhat, e.g., generator condition monitor, flux probe for field turn shorts, stator endwinding vibration instrumentation, and partial discharge (PD) instrumentation.
Keywords
condition monitoring; electric generators; electromagnetic interference; machine testing; magnetic flux; partial discharges; power plants; stators; electric machinery; electrical equipment; electromagnetic interference testing; flux probe; generator condition monitor; partial discharge instrumentation; power plant; standard online monitoring instrumentation; stator endwinding vibration instrumentation; Electromagnetic interference; Generators; Instruments; Monitoring; Partial discharges; Stator windings; Testing; Partial Discharge; Stator Windings; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Insulation Conference (EIC), 2011
Conference_Location
Annapolis, MD
ISSN
pending
Print_ISBN
978-1-4577-0278-5
Electronic_ISBN
pending
Type
conf
DOI
10.1109/EIC.2011.5996174
Filename
5996174
Link To Document