• DocumentCode
    2936063
  • Title

    Research and Realize of Conversion between Auxiliary System Protocol and IEC 61850 in Smart Substation

  • Author

    Ma, Yangang ; Liu, Junzhou

  • Author_Institution
    NARI Technol. Dev. Co., Ltd., State Grid Corp. of China, Nanjing, China
  • fYear
    2011
  • fDate
    25-28 March 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    After the modification of intelligent substation reconstruction, it will access more auxiliary system, in order to better the management of substation and the auxiliary system will access the system of the station anti-maloperation layer, and IEC61850 has already become standard protocol of the station anti-maloperation layer of substation and secondary equipment communication. The conversion of traditional protocol of dot-oriented technique towards IEC 61850 of the object-oriented technique is an inevitable trend of the network technique development. The non-IEC61850 protocol must convert the protocol conversation before it access the system of the station anti-maloperation layer. This paper takes CDT protocol for an example and discusses the principle and the implementation of conversing CDT protocol to IEC 61850 in this article.
  • Keywords
    IEC standards; protocols; substations; IEC 61850; auxiliary system protocol; cyclic digital transmit protocol; dot-oriented technique; intelligent substation reconstruction; object-oriented technique; secondary equipment communication; smart substation; station antimaloperation layer; substation management; Data models; IEC standards; Logic gates; Protocols; Substations; XML;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific
  • Conference_Location
    Wuhan
  • ISSN
    2157-4839
  • Print_ISBN
    978-1-4244-6253-7
  • Type

    conf

  • DOI
    10.1109/APPEEC.2011.5748852
  • Filename
    5748852