• DocumentCode
    2938380
  • Title

    Reading of GB 9254-2008 and research on its affection for the construction of electromagnetic compatibility laboratory

  • Author

    Ping Xu ; Haijun Wan ; Mingjuan Cai ; Tingting Feng ; Yong Zhang

  • Author_Institution
    Stand. & Specification Res. Inst., Shanghai, China
  • fYear
    2012
  • fDate
    6-9 Nov. 2012
  • Firstpage
    384
  • Lastpage
    386
  • Abstract
    The implement of GB 9254-2008 called out the higher and newer requirements for the construction of electromagnetic compatibility(EMC) laboratory. But currently, quite a lot of inland labs can´t satisfy the requirements. Based on the analyzing of historically evolvement of GB 9254, this paper dedicatedly analyses the most updated desire for radio disturbance test of information technology equipment. Therefore, the requirements for the construction of EMC lab and the construction schemes according with GB 9254-2008 are produced. All the results of the research have significant effects on construction and upgrade of the satisfied EMC lab.
  • Keywords
    electromagnetic compatibility; information technology; EMC lab; GB 9254-2008 reading; electromagnetic compatibility laboratory construction; information technology equipment; radio disturbance test; Antenna measurements; Electromagnetic compatibility; Frequency measurement; Information technology; Laboratories; Standards; Transmission line measurements; GB 9254; anechoic enclosure; electromagnetic compatibility (EMC); information technology equipment; laboratory construction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Environmental Electromagnetics (CEEM), 2012 6th Asia-Pacific Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4673-0030-8
  • Type

    conf

  • DOI
    10.1109/CEEM.2012.6410649
  • Filename
    6410649