    A re-fit methodology for electrical equipment on heavy industrial plant

  • Author

    Janusz, J.M. ; Bullock, P.J.

  • Author_Institution
    Natal Univ., South Africa
  • fYear
    1992
  • fDate
    22-24 Sep 1992
  • Firstpage
    521
  • Lastpage
    522
  • Abstract
    The political and economic climate in South Africa has led to a severe reduction in capital available for large CAPE projects. As a result, many large producers of basic raw and semifinished materials have resorted to refitting or upgrading their existing production facilities from a mechanical and electrical point of view, thus conserving capital and utilizing valuable capital to the best effect. The authors discuss a methodology for handling such refits and refer to practical experiences gained by the authors on recent refit contracts. According to this methodology, the refit of a plant control system can be divided into three essential stages: (a) tender stage, (b) design and manufacture stage, and (c) commissioning stage. During each of these phases there are specific activities and feedback loops between client and supplier that must be taken care of. A few examples of these are given
  • Keywords
    power apparatus; CAPE projects; South Africa; commissioning; contracts; design; electrical equipment; experiences; feedback loops; heavy industrial plant; maintenance; manufacture; plant control system; raw materials; refitting; semifinished materials; tender stage; upgrading; Gold; Industrial plants; Power cables; Power distribution; Space technology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AFRICON '92 Proceedings., 3rd AFRICON Conference
  • Conference_Location
    Ezulwini Valley
  • Print_ISBN
    0-7803-0835-2
  • Type

    conf

  • DOI
    10.1109/AFRCON.1992.626571
  • Filename
    626571