DocumentCode :
2944246
Title :
Virtual mini-line management system for new product pilot run control
Author :
Wu, De-Lung ; Lo, Hsi-Lo ; Pan, Cheng-Chung
Author_Institution :
Rexchip Semicond. Corp., Taichung
fYear :
2007
fDate :
15-17 Oct. 2007
Firstpage :
1
Lastpage :
4
Abstract :
This paper purpose is to improve the turn rate of "pilot lot" to shorten new product development time. These lots belong to the R&D department. We call these lots as R&D lots. In order to push these lots shorter than production lots, we construct a virtual mini-line in already existing production line to satisfy production output requirement for manufacture department and new product pilot run requirement for R&D department. After the mini-line system released, we got good results. Our Technology development cycle time in super hot lot/hot lot improved 10.6% and 11.9% respectively than before.
Keywords :
industrial control; lot sizing; product development; research and development; semiconductor device manufacture; R&D department; manufacture department; product development time; product pilot run control; production line; production lots; production output requirement; virtual mini-line management system; Control systems; Customer satisfaction; Dispatching; Manufacturing; Monitoring; Product development; Production; Real time systems; Research and development; Research and development management; cycle time; mini-line; real time dispatcher; super hot lot;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing, 2007. ISSM 2007. International Symposium on
Conference_Location :
Santa Clara, CA
ISSN :
1523-553X
Print_ISBN :
978-1-4244-1142-9
Electronic_ISBN :
1523-553X
Type :
conf
DOI :
10.1109/ISSM.2007.4446812
Filename :
4446812
Link To Document :
بازگشت