DocumentCode
2944523
Title
The Study on Rate of Nonlinear Direct Cost Based on Neural Network
Author
Jia, Zhengyuan ; Gong, Lihua
Author_Institution
Sch. of Bus. Adm., North China Electr. Power Univ., Baoding, China
Volume
3
fYear
2009
fDate
11-12 April 2009
Firstpage
342
Lastpage
345
Abstract
The relationship between direct cost and activity duration is the base of network planning. Under normal circumstances in order to calculate it simply they assumed that the relationship is linear, in fact the direct cost of the project in function is nonlinear. Based on the comprehensive analysis of a large number of projects this paper developed a universal nonlinear function of the direct cost and use neural network to solve the coefficients. The nonlinear function of direct cost can describe the relationship between direct cost and duration more precise. After simulation of project, it is verified that the method is validity practicality.
Keywords
costing; neural nets; nonlinear functions; optimisation; network planning; neural network; project activity duration; project cost nonlinear function; time cost optimization; Automation; Building materials; Cost function; Electric variables measurement; Linearity; Mechatronics; Neural networks; Power measurement; Project management; Technology planning; neural network; non-linear function; time-cost optimization; working procedure;
fLanguage
English
Publisher
ieee
Conference_Titel
Measuring Technology and Mechatronics Automation, 2009. ICMTMA '09. International Conference on
Conference_Location
Zhangjiajie, Hunan
Print_ISBN
978-0-7695-3583-8
Type
conf
DOI
10.1109/ICMTMA.2009.101
Filename
5203216
Link To Document