• DocumentCode
    2945474
  • Title

    Supply chain re-engineering through enterprise-level simulation

  • Author

    Niu, Sophia ; Zhang, Mike Tao

  • Author_Institution
    ILOG Software Technol. (Shanghai) Co., Ltd., Shanghai
  • fYear
    2007
  • fDate
    15-17 Oct. 2007
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The cycle time of semiconductor manufacturing becomes longer and longer due to the continuously increasing complexity of global supply chain. It prevents chip makers from improving customer responsiveness and making business profitable. To facilitate supply chain decision at the enterprise-level, we model a supply chain from fabs, assembly & test sites, to distribution centers for a typical product family by using simulation. We describe the simulation modeling and validation. We also conduct detailed sensitivity analysis and identify the tens of million USD cost saving opportunities through subcon consolidation and a centralized die hub.
  • Keywords
    business process re-engineering; costing; customer satisfaction; integrated circuit manufacture; profitability; sensitivity analysis; supply chain management; chip making; cost saving; customer responsiveness; enterprise-level simulation; global supply chain; profitability; semiconductor manufacturing; sensitivity analysis; simulation modeling; supply chain reengineering; Assembly; Costs; Delay; Packaging; Production facilities; Road transportation; Semiconductor device manufacture; Semiconductor device modeling; Supply chains; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2007. ISSM 2007. International Symposium on
  • Conference_Location
    Santa Clara, CA
  • ISSN
    1523-553X
  • Print_ISBN
    978-1-4244-1142-9
  • Electronic_ISBN
    1523-553X
  • Type

    conf

  • DOI
    10.1109/ISSM.2007.4446881
  • Filename
    4446881