DocumentCode :
2955904
Title :
Single buyer - A step forward in Malaysian Electricity Supply Industry reform
Author :
Mohd Zamin, Noor Zafina ; Zainol Abidin, Nor Ziha ; Ibrahim, Joon B.
Author_Institution :
Planning Div., Single Buyer Dept., Tenaga Nasional Berhad, Kuala Lumpur, Malaysia
fYear :
2013
fDate :
17-19 April 2013
Firstpage :
391
Lastpage :
397
Abstract :
This paper describes the historical evolution of the Malaysian Electricity Supply Industry (MESI) leading to the formalization of the Single Buyer. Key MESI reform initiatives are highlighted and a survey on reform in neighboring countries is included. The new functional structure and framework of the Single Buyer is also presented. The MESI´s reformed Single Buyer framework includes a new reporting structure and is ring-fenced to enhance transparency and accountability. The Single Buyer Rules and Codes of Conduct ensure the impartial and unbiased operationalization of the power purchase agreements (PPAs) and further strengthen the roles of the regulator. Finally, the significance and relevance of the Single Buyer and its advantages in the Malaysian context are enumerated and discussed.
Keywords :
electricity supply industry; power markets; power system economics; MESI; Malaysian electricity supply industry reform; functional structure; power purchase agreement; reporting structure; ring fence; single buyer codes of conduct; single buyer rule; unbiased operationalization; Contracts; Electricity; Government; Industries; Planning; Power generation; Privatization; Incentive Based Regulation; electricity industry reform; managed market model; ring fencing; single buyer; single buyer´s rules;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
TENCON Spring Conference, 2013 IEEE
Conference_Location :
Sydney, NSW
Print_ISBN :
978-1-4673-6347-1
Type :
conf
DOI :
10.1109/TENCONSpring.2013.6584478
Filename :
6584478
Link To Document :
بازگشت