• DocumentCode
    2961894
  • Title

    Simulating the transport and scheduling of priority lots in semiconductor factories

  • Author

    DeJong, Chad D. ; Wu, S.P.

  • Author_Institution
    Intel Corp., Chandler, AZ, USA
  • Volume
    2
  • fYear
    2002
  • fDate
    8-11 Dec. 2002
  • Firstpage
    1387
  • Abstract
    As the high technology product market becomes more dynamic and competitive, chip manufacturers need to bring products to customers in short periods of time. As a result, semiconductor fabrication plants regularly contain lots with priority status. These lots have several unique characteristics compared to other production lots, both in terms of lot transport and scheduling on tools. These lots consume tool capacity that may impact the factory output rate. Priority lots also have specific policies for transport. The impact of these priority lots on other lots in the fabrication is not easily quantified, as many factors are involved. Dynamic factory and AMHS simulation models are capable of capturing the variability of a factory, and the interactions of critical constraints that prevent predictable manufacturing. This paper presents a breakthrough modeling approach to study the behaviors of priority lots, and to quantify their impact to manufacturing.
  • Keywords
    digital simulation; factory automation; materials handling; scheduling; semiconductor device manufacture; AMHS; chip manufacturers; constraint interactions; modeling; priority lots; scheduling; semiconductor fabrication plants; semiconductor factories; transport simulation; Fabrication; Job shop scheduling; Materials handling; Postal services; Predictive models; Production facilities; Pulp manufacturing; Semiconductor device manufacture; Testing; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2002. Proceedings of the Winter
  • Print_ISBN
    0-7803-7614-5
  • Type

    conf

  • DOI
    10.1109/WSC.2002.1166407
  • Filename
    1166407