• DocumentCode
    2962755
  • Title

    Implementation: the real total quality challenge

  • Author

    Grunenwald, William J.

  • Author_Institution
    ADM Consultants Inc., Fairborn, OH, USA
  • fYear
    1989
  • fDate
    22-26 May 1989
  • Firstpage
    1471
  • Abstract
    Seven steps to total-quality implementation are listed and discussed. These are (1) establish a full time advocate, (2) develop a formal plan, (3) be consistent, (4) provide the resources, (5) select improvement areas carefully, (6) consider outside help, and (7) be patient
  • Keywords
    management; quality control; formal plan; total quality management; Business continuity; Companies; Costs; Fellows; Job design; Quality management; Resource management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Aerospace and Electronics Conference, 1989. NAECON 1989., Proceedings of the IEEE 1989 National
  • Conference_Location
    Dayton, OH
  • Type

    conf

  • DOI
    10.1109/NAECON.1989.40407
  • Filename
    40407