Criticality Analysis in Precedence Networks with Multiple Time-Constraints
Author
Zhang LiHui ; Chen Xinlu ; Zou Xin
Author_Institution
Sch. of Econ. & Manage., North China Electr. Power Univ., Beijing, China
fYear
2011
fDate
12-14 Aug. 2011
Firstpage
1
Lastpage
4
Abstract
A method for floats computing and activity criticality analysis in precedence networks with multiple time-constraints is proposed in this paper. Different from the traditional CPM networks, the existence of time constraints makes some of activities on the critical path have floats. A procedure for computing temporal parameters in precedence networks with time-constraints is presented, including forward algorithm and backward algorithm. Then five types of floats are defined and analyzed. On the basis of these, activity criticality is analyzed. An example is presented to illustrate the procedure for floats computing and criticality analysis. The method proposed in this paper presents project managers a useful tool to identify activity criticality in precedence networks with time-constraints.
Keywords
critical path analysis; project management; activity criticality analysis; backward algorithm; floats computing; forward algorithm; multiple time-constraints; precedence network; Algorithm design and analysis; Europe; Ground penetrating radar; Project management; Schedules; Time factors; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2011 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-6579-8
Type
conf
DOI
10.1109/ICMSS.2011.5998190
Filename
5998190
Link To Document