    A genetic algorithm for reactive scheduling based on real-time manufacturing information

  • Author

    Wu, L.H. ; Chen, X.D. ; Chen, X. ; Chen, Q.X.

  • Author_Institution
    Sch. of Electro-Mech. Eng., Guangdong Univ. of Technol., Guangzhou, China
  • fYear
    2010
  • fDate
    11-13 Jan. 2010
  • Firstpage
    375
  • Lastpage
    381
  • Abstract
    In real manufacturing system of moulds production, many unexpected events (e.g., processing time variability, job revision, urgent jobs arrival, etc.) often lead to numerous schedule disruptions. The random dynamic characteristics of the scheduling environment render the baseline schedule made off-line infeasible when applied to practical problems. Based on real-time manufacturing information getting from the manufacturing executing system (MES), we would quickly revise the baseline schedule that has suffered from disruptions during schedule execution. In this paper, we restrict ourselves to the reactive scheduling problem encountered in the manufacturing moulds. First, we model the job shop scheduling problem as a dynamic constraint satisfaction problem, where the due date constraint is considered as tightest condition, since a late job completion will incur a large penalty payments to the customers. After a distribution to the schedule, instead of total rescheduling, we present a reactive local repair approach, based on genetic algorithm to make the revised schedule deviate from original schedule as little as possible. The object is to minimize the distance between two schedules, defined as the weighted sum of the absolute deviations between the planned and realized operation start and finish times. In experiment studies, we consider the main uncertainty: process duration variability, and suppose that it is subjected to a uniform distribution. The experimental results suggest that the proposed approach can increase the on-time delivery rate for real situations.
  • Keywords
    constraint theory; genetic algorithms; job shop scheduling; manufacturing systems; moulding; real-time systems; MES; baseline schedule; due date constraint; dynamic constraint satisfaction problem; genetic algorithm; job shop scheduling problem; manufacturing executing system; manufacturing moulds; moulds production; penalty payments; reactive local repair approach; reactive scheduling problem; real manufacturing system; real-time manufacturing information; scheduling environment; Genetic algorithm; Local repair; Reactive scheduling; Uncertainty;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Responsive Manufacturing - Green Manufacturing (ICRM 2010), 5th International Conference on
  • Conference_Location
    Ningbo
  • Type

    conf

  • DOI
    10.1049/cp.2010.0460
  • Filename
    5629091