• DocumentCode
    29709
  • Title

    Prioritizing Circuit Breaker and Protective Relay Maintenance Using an Arc Flash Hazard Assessment

  • Author

    Doan, Daniel R.

  • Author_Institution
    DuPont Eng., Wilmington, DE, USA
  • Volume
    49
  • Issue
    2
  • fYear
    2013
  • fDate
    March-April 2013
  • Firstpage
    799
  • Lastpage
    802
  • Abstract
    In difficult economic times, companies sometimes delay the performance of maintenance on electrical power distribution equipment to save costs. If this happens, some circuit breakers (CBs) or protective relays will miss their scheduled maintenance and testing. This can create a significant safety risk if those protective devices are used to manage arc flash hazards. This paper describes a study method to determine which CBs and protective relays in a system are the most critical so that they can be prioritized for continued proper maintenance.
  • Keywords
    arcs (electric); circuit breakers; maintenance engineering; relay protection; CB; arc flash hazard assessment; circuit breaker; electrical power distribution equipment; protective devices; protective relay maintenance; Arc discharges; Circuit breakers; Hazards; Maintenance engineering; Protective relaying; Reliability; Arc flash hazard; maintenance; reliability;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/TIA.2013.2242818
  • Filename
    6420931