• DocumentCode
    2971167
  • Title

    Comparison of project objectives and critical factors between DBB and DB in China

  • Author

    Chen YongQiang ; Zhu Xingyu ; Zhang Ning

  • Author_Institution
    Sch. of Manage., Tianjin Univ., Tianjin, China
  • fYear
    2009
  • fDate
    8-11 Dec. 2009
  • Firstpage
    583
  • Lastpage
    587
  • Abstract
    The selection of project delivery systems is a critical problem for project owners, because it will directly affect the achievement of owner´s project objectives. At the beginning, this paper proposes the project objectives of Design-Bid-Build and Design-Build project, and also the factors influencing the selection of Design-Bid-Build and Design-Build. Then, Reliability Analysis and Non-parametric test are adopted to analyze the differences of the project objectives between Design-Bid-Build and Design-Build project, and the differences of the factors that influence the selection of Design-Bid-Build and Design-Build in mainland China. At last, this paper concludes the critical factors that influence the selection of Design-Bid-Build and Design-Build.
  • Keywords
    construction industry; contracts; design; project management; China; design-bid-build project; design-build project; nonparametric test; project delivery systems; project objectives; project owners; reliability analysis; Costs; Data analysis; Investments; Packaging; Procurement; Project management; Scheduling; Statistics; Sustainable development; Testing; China; Critical Factors; Design-Bid-Build; Design-Build; Project Delivery System; Project Objectives;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-4869-2
  • Electronic_ISBN
    978-1-4244-4870-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2009.5373271
  • Filename
    5373271