• DocumentCode
    2972762
  • Title

    R&D project planning with multiple trials in uncertain environments

  • Author

    Creemers, Stefan ; De Reyck, Bert ; Leus, Roel

  • Author_Institution
    Dept. of Decision Sci. & Inf. Manage., Katholieke Univ. Leuven, Leuven, Belgium
  • fYear
    2009
  • fDate
    8-11 Dec. 2009
  • Firstpage
    325
  • Lastpage
    329
  • Abstract
    We study project scheduling when individual activities carry a risk of failure, and where an activity´s failure may lead to the project´s overall failure. In the project planning and scheduling literature, this technological uncertainty has typically been ignored and project plans are developed only for scenarios in which the project succeeds. To mitigate the risk that an activity´s failure jeopardizes the entire project, more than one alternative may exist for obtaining certain results, and these alternatives can be implemented either in parallel or sequentially, allowing to model the pursuit of alternative technologies.
  • Keywords
    production planning; project management; research and development; risk management; scheduling; activity failure; project risk; project scheduling; research and development; risk mitigation; technological uncertainty; Job shop scheduling; Optimal scheduling; Project management; Research and development; Research and development management; Risk management; Scheduling algorithm; Stochastic processes; Technology planning; Uncertainty; alternative technologies; exponential distribution; net present value; project planning; stochastic activity durations; uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-4869-2
  • Electronic_ISBN
    978-1-4244-4870-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2009.5373349
  • Filename
    5373349