DocumentCode :
2973200
Title :
Extended maintenance and inspection models for a parallel system
Author :
Mizutani, S. ; Nakagawa, T. ; Chen, M.
Author_Institution :
Dept. of Media Informations, Aichi Univ. of Technol., Gamagori, Japan
fYear :
2009
fDate :
8-11 Dec. 2009
Firstpage :
248
Lastpage :
251
Abstract :
This paper discusses an optimal maintenance policy for a parallel system with periodic inspection. The system is composed of several units which have an independent and identical distribution. When the number of failed unit exceeds a threshold level, the system incurs a loss cost per unit of time from a failure to the next inspection. When the next inspection finds the failure, the system is overhauled, and the system becomes like new. Further, the system is overhauled at planned time in spite of the state of the system. Introducing the loss cost for an inspection and overhaul, the expected cost is obtained and an optimal number of inspections which minimizes the expected cost rate is derived analytically. Numerical examples are given when the failure distribution of each unit is exponential.
Keywords :
cost reduction; failure analysis; inspection; maintenance engineering; optimisation; parallel machines; exponential failure distribution; loss cost per unit time; optimal maintenance policy; parallel system; periodic inspection; system overhauling; Chaos; Cost function; Distributed computing; Electric shock; Engineering management; Grid computing; Industrial engineering; Inspection; Microcomputers; Technology management; Inspection; Number of Failed Units; Optimal Policy; Parallel System;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
978-1-4244-4869-2
Electronic_ISBN :
978-1-4244-4870-8
Type :
conf
DOI :
10.1109/IEEM.2009.5373373
Filename :
5373373
Link To Document :
بازگشت