• DocumentCode
    2981985
  • Title

    Operating time prediction algorithm for synchronous switching on HVCB based on cloud theory

  • Author

    Jinlong Dong ; Guogang Zhang ; Yingsan Geng ; Jianhua Wang

  • Author_Institution
    State Key Lab. of Electr. Insulation & Power Equip., Xi´an Jiaotong Univ., Xi´an, China
  • fYear
    2013
  • fDate
    22-25 Oct. 2013
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Precise prediction of operating time is one of the key factors for synchronous switching to minimize the control error. In this paper an operating time prediction algorithm is proposed based on cloud model, which shows a good applicability to synchronous switching technology on HVCB equipped with hydraulic operating mechanism. The algorithm uses cloud model to build up single-condition multiple-rule illation generators with which the uncertainty prediction is realized. The prediction model is tested for the closing operation with the experimental system. The test results show that the prediction error can satisfy the engineering requirements.
  • Keywords
    circuit breakers; fuzzy set theory; hydraulic control equipment; probability; HVCB; high voltage circuit breaker; hydraulic operating mechanism; operating time prediction algorithm; single-condition multiple-rule illation generators; synchronous switching; Clouds; Educational institutions; Generators; Prediction algorithms; Predictive models; Switching circuits; Uncertainty; HVCB; cloud theory; hydraulic operating mechanism; operating time prediction; synchronous switching technology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    TENCON 2013 - 2013 IEEE Region 10 Conference (31194)
  • Conference_Location
    Xi´an
  • ISSN
    2159-3442
  • Print_ISBN
    978-1-4799-2825-5
  • Type

    conf

  • DOI
    10.1109/TENCON.2013.6718797
  • Filename
    6718797