DocumentCode
2983911
Title
Tracking key indicators in multiple software projects in a dynamic environment
Author
Villarreal, Humberto
Author_Institution
Honeywell Inc., Minneapollis, MN, USA
fYear
1988
fDate
23-27 May 1988
Firstpage
692
Abstract
A method that can enhance the software engineering manager´s ability to assess development progress in ongoing projects and to assess the workload of future projects is described. The method provides tools and techniques that are used to monitor key indicators such as cost, schedule, memory usage (ROM and RAM) and real-time workload. The method is easily automated using a microcomputer and a modern spreadsheet program
Keywords
project engineering; software engineering; RAM; ROM; cost; dynamic environment; key indicators; memory usage; multiple software projects; schedule; software engineering; spreadsheet program; workload; Costs; Engineering management; Microcomputers; Monitoring; Project management; Random access memory; Read only memory; Read-write memory; Software development management; Software engineering;
fLanguage
English
Publisher
ieee
Conference_Titel
Aerospace and Electronics Conference, 1988. NAECON 1988., Proceedings of the IEEE 1988 National
Conference_Location
Dayton, OH
Type
conf
DOI
10.1109/NAECON.1988.195081
Filename
195081
Link To Document