DocumentCode :
2984458
Title :
Advanced quality planning issues
Author :
Craig, Clark
Author_Institution :
Molex Inc., Lisle, IL, USA
fYear :
1989
fDate :
18-20 Sep 1989
Firstpage :
101
Abstract :
Summary form only given. Activities prior to tooling were considered, including: (1) product design FMEA (identification of critical product characteristics, identification of major product characteristics, determination and justification of specification limits, determination of appropriate gaging techniques, and raw material requirements); (2) process FMEA, which encompasses all primary processes such as stamping, molding, plating, and assembly. Also considered were tool qualification (first article requirements, process potential study requirements, gage potential requirements, and long-term process qualification); and quality requirements (Cpk requirements, deviation from target, and quality as produced and shipped evaluation)
Keywords :
electric connectors; management; manufacture; quality control; connectors manufacture; pre-tooling activities; process FMEA; product design FMEA; quality planning issues; quality requirements; tool qualification; Assembly; Product design; Qualifications; Raw materials; Steel;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Contacts, 1989., Proceedings of the Thirty Fifth Meeting of the IEEE Holm Conference on
Conference_Location :
Chicago, IL
Type :
conf
DOI :
10.1109/HOLM.1989.77926
Filename :
77926
Link To Document :
بازگشت