• DocumentCode
    2986726
  • Title

    The Reassignment Planning for Maintenance and Repairment of Railway-Cars in Jinan Railway Bureau

  • Author

    Ma, Xiaofei ; Li, Wei

  • Author_Institution
    Dept. of Ind. Eng., BUU, Beijing, China
  • fYear
    2011
  • fDate
    12-14 Aug. 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper first analyzes a few problems deeply and thoroughly. According to the requirement for the car maintenance and repairment in the cause of the transport production in Jinan Railway Bureau, a transport programming was given out for the whole location of the car maintenance and repairment in Jinan West Car-depot with an analysis to the quantity of the car maintenance and repairment task. At the same time, we demonstrated how to set a correct decision-making in the face of new situations and new challenges, and how to optimize the production-organization and how to make a concrete reconstruction scheme in accordance with the railway development as a whole.
  • Keywords
    decision making; maintenance engineering; planning; railway rolling stock; Jinan Railway Bureau; Jinan West Car-depot; decision making; railway-cars maintenance; railway-cars repairment; reassignment planning; Analytical models; Conferences; Maintenance engineering; Marketing and sales; Production; Programming; Rail transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2011 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-6579-8
  • Type

    conf

  • DOI
    10.1109/ICMSS.2011.5999395
  • Filename
    5999395