DocumentCode :
2987545
Title :
Unit commitment considering generator outages through a mixed-integer particle swarm optimization algorithm
Author :
Wang, Lingfeng ; Singh, Chanan
Author_Institution :
Department of Electrical and Computer Engineering, Texas A&M University, College Station, 77843, USA
fYear :
2006
fDate :
7-9 April 2006
Firstpage :
261
Lastpage :
266
Abstract :
The optimum economic operation and planning of electric power generation systems occupies a crucial position in the electric power industry. Unit commitment (UC) is an important function in generation resource management. Moreover, it is nowadays critical to incorporate reliability analysis of the power system into its design of operation strategy. For this purpose, equipment malfunction or failure should be considered in unit commitment. In this paper, first the model for UC considering generator outages is formulated, where the reliability requirement is incorporated into the spinning reserve constraint in the optimization design. Then, a mixed binary- and real-coded particle swarm optimization (PSO) is developed to locate the optimum generation combination. A 10-generator test power system is used to verify the effectiveness of the proposed approach along the 24-hour planning horizon. A comparative study is also conducted to examine the impact of reliability constraint on the optimal solution obtained.
Keywords :
Electrical equipment industry; Industrial economics; Particle swarm optimization; Power generation; Power generation economics; Power system economics; Power system modeling; Power system planning; Power system reliability; Resource management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Region 5 Conference, 2006 IEEE
Conference_Location :
San Antonio, TX, USA
Print_ISBN :
978-1-4244-0358-5
Electronic_ISBN :
978-1-4244-0359-2
Type :
conf
DOI :
10.1109/TPSD.2006.5507419
Filename :
5507419
Link To Document :
بازگشت