• DocumentCode
    2989147
  • Title

    Cost of quality as a baseline for total quality management (TQM) implementation

  • Author

    Grunenwald, William J.

  • Author_Institution
    ADM Consultants Inc., Fairborn, OH, USA
  • fYear
    1989
  • fDate
    22-26 May 1989
  • Firstpage
    1611
  • Abstract
    The author presents the concept of using cost of quality as an effective tool in implementation of a total-quality-management (TQM) approach. The essence of TQM is defined as the search for opportunities for improvement. TQM implementation and the need for baseline are discussed. The requirements for establishing a baseline are discussed, with the focus on cost of quality. The use of the cost-of-quality baseline is detailed, with emphasis on its continuous value. The establishment of certain `universal truths´ which address the use of TQM and cost of quality in a given environment is examined
  • Keywords
    economics; management; quality control; TQM; baseline; quality cost; total quality management implementation; Area measurement; Costs; Problem-solving; Quality management; Statistics; Stress; Teamwork; Total quality management; Yarn;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Aerospace and Electronics Conference, 1989. NAECON 1989., Proceedings of the IEEE 1989 National
  • Conference_Location
    Dayton, OH
  • Type

    conf

  • DOI
    10.1109/NAECON.1989.40432
  • Filename
    40432