Title :
Optimal planned leadtimes in two-level assembly system with Inventory Liability Period Contract
Author :
Tang Yao ; Ma Shi-hua ; Zhou Qi-chao
Author_Institution :
Sch. of Manage., Huazhong Univ. of Sci. & Technol., Wuhan, China
Abstract :
Leadtimes uncertainty contributes much to the operational complexity in an assembly system. In order to reduce the impair of stochastic leadtimes, some appropriate inventory policies for components are brought up, which include VMI strategy. Although, VMI arrangement helps to improve the supply chain performance in some degree, there remain two problems to be solved, one is how to lessen suppliers´ inventory pressure, the other is how to coordinate the individual decisions. Considering the practical awkward situation, this paper introduces Inventory Liability Period Contract (ILPC) and then sheds light on planned leadtimes decisions and inventory cost sharing mechanism in an decentralized system. We model the interaction between suppliers and manufacturer as a Stackelberg game which embeds a Nash game about planned leadtimes decisions. Our results show that: Taking the centralized system as a benchmark we can get the optimal planned leadtimes portfolio for an decentralized system; With optimal leadtimes guaranteed, the penalty for suppliers increases when the Inventory Liability Period (ILP) turns longer; Inventory Liability Period Contract can allocate the inventory cost efficiently among gamers in the supply chain.
Keywords :
assembly planning; contracts; costing; game theory; inventory management; stochastic processes; supply chain management; ILPC; Nash game; Stackelberg game; VMI arrangement; VMI strategy; decentralized system; inventory cost sharing mechanism; inventory liability period contract; inventory policies; leadtime uncertainty; operational complexity; optimal planned leadtimes; stochastic leadtimes; supply chain; two-level assembly system; vendor-managed inventory; Assembly; Assembly systems; Contracts; Lead; Stochastic processes; Supply chains; Uncertainty; assembly system; inventory liability period contract; stochastic leadtimes; vendor-managed -inventory;
Conference_Titel :
Management Science and Engineering (ICMSE), 2012 International Conference on