• DocumentCode
    2991446
  • Title

    Optimal planned leadtimes in two-level assembly system with Inventory Liability Period Contract

  • Author

    Tang Yao ; Ma Shi-hua ; Zhou Qi-chao

  • Author_Institution
    Sch. of Manage., Huazhong Univ. of Sci. & Technol., Wuhan, China
  • fYear
    2012
  • fDate
    20-22 Sept. 2012
  • Firstpage
    439
  • Lastpage
    444
  • Abstract
    Leadtimes uncertainty contributes much to the operational complexity in an assembly system. In order to reduce the impair of stochastic leadtimes, some appropriate inventory policies for components are brought up, which include VMI strategy. Although, VMI arrangement helps to improve the supply chain performance in some degree, there remain two problems to be solved, one is how to lessen suppliers´ inventory pressure, the other is how to coordinate the individual decisions. Considering the practical awkward situation, this paper introduces Inventory Liability Period Contract (ILPC) and then sheds light on planned leadtimes decisions and inventory cost sharing mechanism in an decentralized system. We model the interaction between suppliers and manufacturer as a Stackelberg game which embeds a Nash game about planned leadtimes decisions. Our results show that: Taking the centralized system as a benchmark we can get the optimal planned leadtimes portfolio for an decentralized system; With optimal leadtimes guaranteed, the penalty for suppliers increases when the Inventory Liability Period (ILP) turns longer; Inventory Liability Period Contract can allocate the inventory cost efficiently among gamers in the supply chain.
  • Keywords
    assembly planning; contracts; costing; game theory; inventory management; stochastic processes; supply chain management; ILPC; Nash game; Stackelberg game; VMI arrangement; VMI strategy; decentralized system; inventory cost sharing mechanism; inventory liability period contract; inventory policies; leadtime uncertainty; operational complexity; optimal planned leadtimes; stochastic leadtimes; supply chain; two-level assembly system; vendor-managed inventory; Assembly; Assembly systems; Contracts; Lead; Stochastic processes; Supply chains; Uncertainty; assembly system; inventory liability period contract; stochastic leadtimes; vendor-managed -inventory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science and Engineering (ICMSE), 2012 International Conference on
  • Conference_Location
    Dallas, TX
  • ISSN
    2155-1847
  • Print_ISBN
    978-1-4673-3015-2
  • Type

    conf

  • DOI
    10.1109/ICMSE.2012.6414218
  • Filename
    6414218