DocumentCode
2994490
Title
Radical breakthrough innovative solution in SHBI PM optimization using TRIZ
Author
Annamalai, Nagappan ; Patel, Nirav K. ; Muthukarapan, Subramaniam
Author_Institution
Intel Technol. Sdn. Bhd., Penang, Malaysia
fYear
2008
fDate
4-6 Nov. 2008
Firstpage
1
Lastpage
3
Abstract
Preventive maintenance (PM) is a crucial activity to ensure the stability and performance of a tool. It has lead to long hour and tedious activity on SHBI (Self Heat Burn-In). SHBI is a tool used to support the Burn-In process. SHBI carries several long hour PM task which also requires some conversion activities. This has been leading to a total >15% weekly capacity loss. This paper will discuss on how both the unproductive long hour activities have been analyzed through theory of innovative problem solving (TRIZ) methodology.
Keywords
preventive maintenance; SHBI PM optimization; TRIZ; innovative problem solving; preventive maintenance; self heat burn-in; stability; Automatic testing; Built-in self-test; Electronic equipment testing; Hardware; Manufacturing processes; Merging; Performance analysis; Robots; Stability; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronic Manufacturing Technology Symposium (IEMT), 2008 33rd IEEE/CPMT International
Conference_Location
Penang
ISSN
1089-8190
Print_ISBN
978-1-4244-3392-6
Electronic_ISBN
1089-8190
Type
conf
DOI
10.1109/IEMT.2008.5507884
Filename
5507884
Link To Document