DocumentCode :
2997529
Title :
Research on multi-level material monitoring mode and coordination method oriented to production process
Author :
Xue, Dongjuan ; Gao, Tianyi
Author_Institution :
Coll. of Mech. Eng., Dalian Fisheries Univ., Dalian
fYear :
2008
fDate :
1-3 Sept. 2008
Firstpage :
1244
Lastpage :
1248
Abstract :
According to the difference of materials production and their monitoring requirements, the monitoring levels are partitioned and designed and the multi-level materials monitoring mode is found. Aiming to materials tardiness, dynamic adjusting algorithm of linking local coordination with global coordination for lacking parts is brought forward and dynamic coordination structure is put up and adjustment steps are given. At last, a materials monitoring example in production management system implemented in a complex equipments enterprise is given to prove this method reasonable and effective.
Keywords :
process monitoring; production management; production materials; coordination method; dynamic adjusting algorithm; dynamic coordination structure; global coordination; local coordination; materials production; materials tardiness; monitoring requirements; multilevel material monitoring; production process; Assembly; Building materials; Computerized monitoring; Design automation; Educational institutions; Logistics; Material storage; Mechanical engineering; Production facilities; Production management; Coordination; Material Tardiness; Materials; Monitoring;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
Conference_Location :
Qingdao
Print_ISBN :
978-1-4244-2502-0
Electronic_ISBN :
978-1-4244-2503-7
Type :
conf
DOI :
10.1109/ICAL.2008.4636342
Filename :
4636342
Link To Document :
بازگشت