DocumentCode
2997529
Title
Research on multi-level material monitoring mode and coordination method oriented to production process
Author
Xue, Dongjuan ; Gao, Tianyi
Author_Institution
Coll. of Mech. Eng., Dalian Fisheries Univ., Dalian
fYear
2008
fDate
1-3 Sept. 2008
Firstpage
1244
Lastpage
1248
Abstract
According to the difference of materials production and their monitoring requirements, the monitoring levels are partitioned and designed and the multi-level materials monitoring mode is found. Aiming to materials tardiness, dynamic adjusting algorithm of linking local coordination with global coordination for lacking parts is brought forward and dynamic coordination structure is put up and adjustment steps are given. At last, a materials monitoring example in production management system implemented in a complex equipments enterprise is given to prove this method reasonable and effective.
Keywords
process monitoring; production management; production materials; coordination method; dynamic adjusting algorithm; dynamic coordination structure; global coordination; local coordination; materials production; materials tardiness; monitoring requirements; multilevel material monitoring; production process; Assembly; Building materials; Computerized monitoring; Design automation; Educational institutions; Logistics; Material storage; Mechanical engineering; Production facilities; Production management; Coordination; Material Tardiness; Materials; Monitoring;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
Conference_Location
Qingdao
Print_ISBN
978-1-4244-2502-0
Electronic_ISBN
978-1-4244-2503-7
Type
conf
DOI
10.1109/ICAL.2008.4636342
Filename
4636342
Link To Document