• DocumentCode
    2997529
  • Title

    Research on multi-level material monitoring mode and coordination method oriented to production process

  • Author

    Xue, Dongjuan ; Gao, Tianyi

  • Author_Institution
    Coll. of Mech. Eng., Dalian Fisheries Univ., Dalian
  • fYear
    2008
  • fDate
    1-3 Sept. 2008
  • Firstpage
    1244
  • Lastpage
    1248
  • Abstract
    According to the difference of materials production and their monitoring requirements, the monitoring levels are partitioned and designed and the multi-level materials monitoring mode is found. Aiming to materials tardiness, dynamic adjusting algorithm of linking local coordination with global coordination for lacking parts is brought forward and dynamic coordination structure is put up and adjustment steps are given. At last, a materials monitoring example in production management system implemented in a complex equipments enterprise is given to prove this method reasonable and effective.
  • Keywords
    process monitoring; production management; production materials; coordination method; dynamic adjusting algorithm; dynamic coordination structure; global coordination; local coordination; materials production; materials tardiness; monitoring requirements; multilevel material monitoring; production process; Assembly; Building materials; Computerized monitoring; Design automation; Educational institutions; Logistics; Material storage; Mechanical engineering; Production facilities; Production management; Coordination; Material Tardiness; Materials; Monitoring;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
  • Conference_Location
    Qingdao
  • Print_ISBN
    978-1-4244-2502-0
  • Electronic_ISBN
    978-1-4244-2503-7
  • Type

    conf

  • DOI
    10.1109/ICAL.2008.4636342
  • Filename
    4636342