• DocumentCode
    3000209
  • Title

    Crane scheduling in batch annealing process

  • Author

    Xie, Xie ; Tang, Lixin

  • Author_Institution
    Inst. of Logistics, Northeastern Univ., Shenyang
  • fYear
    2008
  • fDate
    1-3 Sept. 2008
  • Firstpage
    2020
  • Lastpage
    2025
  • Abstract
    In this paper, we study the crane scheduling problem of batch annealing process to minimize the last job completion (makespan). Some special characteristics of our crane scheduling are contrasted with that of existing two categories. We prove it to be strongly NP-hard and develop a resource assignment problem based heuristic algorithm in a bottleneck level. The heuristics is analysed from an absolute worst-case performance ratio of 3 and an asymptotic worst-case performance ratio is 2 respectively.
  • Keywords
    annealing; batch processing (industrial); cranes; optimisation; scheduling; NP-hard problem; batch annealing process; crane scheduling; resource assignment problem; Annealing; Coils; Cooling; Cranes; Furnaces; Heating; Job shop scheduling; Logistics; Steel; Temperature; Scheduling; absolute worst-case performance ratio; asymptotic worst-case performance ratio; batch annealing process; heuristics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
  • Conference_Location
    Qingdao
  • Print_ISBN
    978-1-4244-2502-0
  • Electronic_ISBN
    978-1-4244-2503-7
  • Type

    conf

  • DOI
    10.1109/ICAL.2008.4636494
  • Filename
    4636494