DocumentCode
3000209
Title
Crane scheduling in batch annealing process
Author
Xie, Xie ; Tang, Lixin
Author_Institution
Inst. of Logistics, Northeastern Univ., Shenyang
fYear
2008
fDate
1-3 Sept. 2008
Firstpage
2020
Lastpage
2025
Abstract
In this paper, we study the crane scheduling problem of batch annealing process to minimize the last job completion (makespan). Some special characteristics of our crane scheduling are contrasted with that of existing two categories. We prove it to be strongly NP-hard and develop a resource assignment problem based heuristic algorithm in a bottleneck level. The heuristics is analysed from an absolute worst-case performance ratio of 3 and an asymptotic worst-case performance ratio is 2 respectively.
Keywords
annealing; batch processing (industrial); cranes; optimisation; scheduling; NP-hard problem; batch annealing process; crane scheduling; resource assignment problem; Annealing; Coils; Cooling; Cranes; Furnaces; Heating; Job shop scheduling; Logistics; Steel; Temperature; Scheduling; absolute worst-case performance ratio; asymptotic worst-case performance ratio; batch annealing process; heuristics;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation and Logistics, 2008. ICAL 2008. IEEE International Conference on
Conference_Location
Qingdao
Print_ISBN
978-1-4244-2502-0
Electronic_ISBN
978-1-4244-2503-7
Type
conf
DOI
10.1109/ICAL.2008.4636494
Filename
4636494
Link To Document