• DocumentCode
    3000531
  • Title

    Time management in distributed factory simulation, a case study using HLA

  • Author

    Wang, Ke ; Xu, Sheng ; McGinnis, Leon F.

  • Author_Institution
    Sch. of Ind. & Syst. Eng., Georgia Inst. of Technol., Atlanta, GA, USA
  • fYear
    2005
  • fDate
    4-7 Dec. 2005
  • Abstract
    Distributed simulation is attractive for modeling large scale manufacturing systems. However, synchronization requirements present distinct challenges in designing and implementing a suitable modeling structure. Our experience in building a distributed simulation model for 300mm wafer fab using the high level architecture (HLA) shows that time management should be considered at both the design and the implementation stages. This paper proposes an optimistic-conservative synchronization scheme by using model specific information at the implementation stage. Computational results are then presented to show that properly implemented distributed factory simulation can achieve significant reduction in model execution time.
  • Keywords
    electron device manufacture; factory automation; time management; 300 mm; distributed factory simulation model; high level architecture; large scale manufacturing system; model execution time; model specific information; modeling structure; optimistic-conservative synchronization scheme; synchronization requirement; time management; Buildings; Computational modeling; Computer aided software engineering; Computer architecture; Distributed computing; Investments; Large-scale systems; Production facilities; Runtime; Semiconductor device modeling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2005 Proceedings of the Winter
  • Print_ISBN
    0-7803-9519-0
  • Type

    conf

  • DOI
    10.1109/WSC.2005.1574452
  • Filename
    1574452