Principal failure cases on distribution switchgear using in the 22.9kV-y distribution system
Author :
Tae-Ho Kwon ; Chong-Eun Cho ; Jong-Man Joung ; Dong-Myung Kim
Author_Institution :
Facility Diagnosis Center, Korea Electr. Power Corp., Daejeon, South Korea
Abstract :
The faults of the pole mounted switchgears and the pad mounted switchgears in the Korea Electric Power Corporation (KEPCO) distribution system that have occurred over the last one year have been analyzed. The result has shown that, in the case of the pole mounted switchgear, 40% of the faults were caused by the bushing part, and, in the case of the pad mounted switchgear, the breakdown of the internal insulators accounted for the 24% of the faults. This research paper will present the causes of the faults through detailed analyses with regard to the principal failure of the switchgears.
Keywords :
bushings; poles and towers; power distribution faults; switchgear; KEPCO distribution system; Korea Electric Power Corporation; distribution switchgear; internal insulators breakdown; pad mounted switchgears; pole mounted switchgears; switchgear principal failure; voltage 22.9 kV; Circuit faults; Electron tubes; Insulators; Porcelain; Surface cracks; Switchgear; BMC; bushing; crack; insulator; moisture absorption; switchgear;
Conference_Titel :
Condition Monitoring and Diagnosis (CMD), 2012 International Conference on
Conference_Location :
Bali
Print_ISBN :
978-1-4673-1019-2
DOI :
10.1109/CMD.2012.6416331