DocumentCode :
3015229
Title :
The Mathematical Model in Optimization of Site Selection for Accumulated Bauxite
Author :
Chen, Jianhong ; Yang, Shan
Author_Institution :
Sch. of Resource & Safety Eng., Central South Univ., Changsha, China
fYear :
2009
fDate :
8-9 Dec. 2009
Firstpage :
137
Lastpage :
140
Abstract :
The mining programming of accumulated bauxite should comprehensively consider the site selection and rational utilization of resources. The mixed integer programming model on optimization of site selection and rational ore blending was constructed on the basis of the theories of logistics planning, operations research, etc. Take Taipingbei mine in Pingguo bauxite as the example, the results which were calculated by the operations research software Xpress-MP show that the model is rationality and feasible. The mathematical model is of great importance to the sustainable utilization of the bauxite resources, increasing mine service life and raising economic benefit of enterprises.
Keywords :
aluminium industry; blending; facility location; integer programming; mineral processing industry; Xpress-MP operations research software; accumulated bauxite mining programming; mixed integer programming model; rational ore blending; resources rational utilization; site selection optimization; Aluminum; Electronic mail; Linear programming; Mathematical model; Operations research; Ores; Production; Protection; Safety; Transportation; Xpress-MP; accumulated bauxite; mixed integer programming model; optimization of site selection; ore blending;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Interaction and Affective Computing, 2009. ASIA '09. International Asia Symposium on
Conference_Location :
Wuhan
Print_ISBN :
978-0-7695-3910-2
Electronic_ISBN :
978-1-4244-5406-8
Type :
conf
DOI :
10.1109/ASIA.2009.22
Filename :
5376030
Link To Document :
بازگشت