DocumentCode
3015229
Title
The Mathematical Model in Optimization of Site Selection for Accumulated Bauxite
Author
Chen, Jianhong ; Yang, Shan
Author_Institution
Sch. of Resource & Safety Eng., Central South Univ., Changsha, China
fYear
2009
fDate
8-9 Dec. 2009
Firstpage
137
Lastpage
140
Abstract
The mining programming of accumulated bauxite should comprehensively consider the site selection and rational utilization of resources. The mixed integer programming model on optimization of site selection and rational ore blending was constructed on the basis of the theories of logistics planning, operations research, etc. Take Taipingbei mine in Pingguo bauxite as the example, the results which were calculated by the operations research software Xpress-MP show that the model is rationality and feasible. The mathematical model is of great importance to the sustainable utilization of the bauxite resources, increasing mine service life and raising economic benefit of enterprises.
Keywords
aluminium industry; blending; facility location; integer programming; mineral processing industry; Xpress-MP operations research software; accumulated bauxite mining programming; mixed integer programming model; rational ore blending; resources rational utilization; site selection optimization; Aluminum; Electronic mail; Linear programming; Mathematical model; Operations research; Ores; Production; Protection; Safety; Transportation; Xpress-MP; accumulated bauxite; mixed integer programming model; optimization of site selection; ore blending;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Interaction and Affective Computing, 2009. ASIA '09. International Asia Symposium on
Conference_Location
Wuhan
Print_ISBN
978-0-7695-3910-2
Electronic_ISBN
978-1-4244-5406-8
Type
conf
DOI
10.1109/ASIA.2009.22
Filename
5376030
Link To Document