• DocumentCode
    3022901
  • Title

    The road map towards 2020

  • Author

    Goodwin, Andrew ; Derby, James

  • Author_Institution
    Energetix Group (Pnu Power), Chester, UK
  • fYear
    2011
  • fDate
    17-19 Jan. 2011
  • Firstpage
    1
  • Lastpage
    1
  • Abstract
    Engineers at PNU Power have harnessed the energy stored in compressed air to provide backup power in high voltage electricity substations. Reduced maintenance costs, elimination of hazardous lead acid batteries, and the need for outside installations were all driving factors for the UK and USA National Grid to look for an alternative to the traditional lead acid battery for backup power.
  • Keywords
    costing; electricity supply industry; energy storage; power distribution economics; power distribution reliability; substations; 2020; PNU power; backup power; compressed air; energy storage; high voltage electricity substations; maintenance costs; road map; Batteries; Electricity; Lead; Lead compounds; Substations; Telecommunications; Uninterruptible power systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Innovative Smart Grid Technologies (ISGT), 2011 IEEE PES
  • Conference_Location
    Hilton Anaheim, CA
  • Print_ISBN
    978-1-61284-218-9
  • Electronic_ISBN
    978-1-61284-219-6
  • Type

    conf

  • DOI
    10.1109/ISGT.2011.5759132
  • Filename
    5759132