DocumentCode
3023375
Title
Construction mechanics analysis of the conjugation between Beijing metro line 4 and line 2
Author
Huang, Mingli ; Lu, Xiao ; Yang, Xiu ; Ning, Wenguang
Author_Institution
Sch. of Civil Eng., Beijing Jiaotong Univ., Beijing, China
fYear
2011
fDate
26-28 July 2011
Firstpage
5330
Lastpage
5333
Abstract
Depending on the background of the civil air joint stage in Xizhimen subway station, this paper makes a numerical simulation on variable section conjugation engineering under complicated condition. The main contents are summarized below :(1)The analysis on stress changes of transitional structure. (2)The analysis on stress changes of the existed tunnel conjugation structure.(3)The analysis on crown settlement of new tunnel and the existed tunnel, and the analysis on differential settlement between new tunnel and the existed tunnel.
Keywords
geotechnical engineering; numerical analysis; stress analysis; tunnels; Beijing metro line; Xizhimen subway station; civil air joint stage; construction mechanics analysis; crown settlement; differential settlement; numerical simulation; stress analysis; transitional structure; tunnel conjugation structure; variable section conjugation engineering; Concrete; Joining processes; Joints; Numerical models; Numerical simulation; Soil; Stress; Crown settlement; Numerical simulation; Stress concentration; Tunneling at shallow depth;
fLanguage
English
Publisher
ieee
Conference_Titel
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location
Hangzhou
Print_ISBN
978-1-61284-771-9
Type
conf
DOI
10.1109/ICMT.2011.6001743
Filename
6001743
Link To Document