• DocumentCode
    3025178
  • Title

    Design of a Subway Station Crossing Urban Trunk Road by Open Cut and Tunneling Method

  • Author

    Zhou Xiaojun ; Hu Hongyun ; Wang Xiaofeng

  • Author_Institution
    Key Lab. of Transp. Tunnel Eng., Southwest Jiaotong Univ., Chengdu, China
  • fYear
    2013
  • fDate
    29-30 June 2013
  • Firstpage
    457
  • Lastpage
    460
  • Abstract
    The design of a subway station that crosses an urban trunk road for automobiles in Chengdu city is summarized in this paper. In view of its special location and structural design, the subway station is built in combination with open cut and tunneling method, its structure consists of three different parts, which includes two reinforced concrete frame structures and a bored tunnel with side platforms. The frame structure is built with open cut method, but the bored tunnel with platform is built by means of tunneling method. The structure and construction process are both summarized in the paper. The scenario may provide guidance for the design and construction of such peculiar subway station under similar circumstances.
  • Keywords
    construction; construction components; design engineering; geotechnical engineering; railway engineering; reinforced concrete; structural engineering; tunnels; Chengdu city; automobiles; bored tunnel; construction process; open cut method; reinforced concrete frame structures; side platforms; structural design; subway station design; tunneling method; urban trunk road; Cities and towns; Earth; Educational institutions; Roads; Rocks; Tunneling; Subway station; bored tunnel with platform; composite lining; cross diaphragm method; double pipe roof protection; open cut method;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Digital Manufacturing and Automation (ICDMA), 2013 Fourth International Conference on
  • Conference_Location
    Qingdao
  • Type

    conf

  • DOI
    10.1109/ICDMA.2013.107
  • Filename
    6598028