DocumentCode
3028806
Title
The mixed coordination method and its application to the hydroelectric scheduling problems
Author
Tang, Jianxin ; Luh, Peter B.
Author_Institution
Div. of Electr. Eng., Alfred Univ., NY, USA
fYear
1989
fDate
14-17 Nov 1989
Firstpage
1173
Abstract
A new approach is presented for solving long-horizon, constrained optimal control problems by using the mixed coordination method. The method was originally developed for unconstrained optimal control problems, with key ideas including time decomposition, mixed coordination and parallel processing. In extending the method to constrained problems, constraints on state and control variables are relaxed by using the multiplier method. For a given set of Lagrange multipliers, the problem is unconstrained and is solved by using the mixed coordination method. The Lagrange multipliers are then updated in a simple and efficient way. Three problems, including one with nonlinear system dynamics and constraints, and a hydroelectric scheduling problem with ten reservoirs, are tested. Results shows that the new approach is numerically stable, and significant speedups are obtained in a simulated parallel-processing environment. The method can be easily extended to handle unpredicted changes during the online operation phase of a system
Keywords
hydroelectric power stations; optimal control; parallel processing; relaxation theory; scheduling; Lagrange multipliers; hydroelectric scheduling; mixed coordination method; nonlinear system dynamics; optimal control; parallel processing; time decomposition; Dynamic programming; Dynamic scheduling; Lagrangian functions; Large-scale systems; Nonlinear dynamical systems; Nonlinear systems; Optimal control; Parallel processing; Reservoirs; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 1989. Conference Proceedings., IEEE International Conference on
Conference_Location
Cambridge, MA
Type
conf
DOI
10.1109/ICSMC.1989.71485
Filename
71485
Link To Document