DocumentCode :
3036673
Title :
Grey Prediction of Elbow Corrosion on Refinery Equipment
Author :
Wang, Zhengfang ; Wang, Yong ; Wang, Weiqiang ; Lu, Chuanyi ; Li, Chaowen
Author_Institution :
Inst. of Mech. Eng., China Univ. of Pet., Dongying
fYear :
2009
fDate :
8-10 March 2009
Firstpage :
75
Lastpage :
78
Abstract :
Shengli refinery plant process Middle-east crude oil, the equipment is exposed to wash erosion seriously. The elbow on the entrance of the atmospheric distillation tower top exchangers always leak for eroding. Measured the thickness of elbow by ultrasonic thickness meter every month, find the accumulating generation operator of remnant thickness is quasi smooth sequence, established GM (1, 1 ) model with grey system theory, detected the error with relative error, model passed error check, is eligible. Used full data to create improved GM (1, 1) model to predict elbowdasias thickness in the future. The elbow life can reach to 24 month, but can not reach to 36 month. Select place to measure thickness by experience is out of truth. Use Fluent to emulate fluid field can help to find the place to monitor.
Keywords :
crude oil; distillation equipment; erosion; grey systems; industrial plants; oil refining; thickness measurement; Fluent; GM (1, 1) model; Middle-east crude oil; Shengli refinery plant; atmospheric distillation tower top exchangers; elbow corrosion; grey prediction; grey system theory; model passed error check; refinery equipment; ultrasonic thickness meter; Atmospheric modeling; Corrosion; Elbow; Mechanical engineering; Petroleum; Poles and towers; Predictive models; Refining; Thickness measurement; Ultrasonic variables measurement; 1) model; GM (1; corrosion prediction; grey system model;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer and Automation Engineering, 2009. ICCAE '09. International Conference on
Conference_Location :
Bangkok
Print_ISBN :
978-0-7695-3569-2
Type :
conf
DOI :
10.1109/ICCAE.2009.38
Filename :
4804492
Link To Document :
بازگشت