• DocumentCode
    3041322
  • Title

    Group preventive maintenance An example of controlled jump processes

  • Author

    Rishel, R.

  • Author_Institution
    University of Kentucky, Lexington, Kentucky
  • fYear
    1981
  • fDate
    16-18 Dec. 1981
  • Firstpage
    786
  • Lastpage
    791
  • Abstract
    The group preventive maintenance problem is used to illustrate problems of computing with the optimality conditions for continuous time contolled jump processes. It is claimed that considerations for this problem motivate using iterative techniques such as policy improvement or successive approximations.
  • Keywords
    Dynamic programming; Equations; Erbium; Preventive maintenance; Process control; Radio control; Stochastic processes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control including the Symposium on Adaptive Processes, 1981 20th IEEE Conference on
  • Conference_Location
    San Diego, CA, USA
  • Type

    conf

  • DOI
    10.1109/CDC.1981.269321
  • Filename
    4047046