DocumentCode
3045410
Title
The first installation under the Italian PV Rooftop Programme: a performance analysis referred to five years of operation
Author
Aste, N. ; Groppi, F. ; Pero, C. Del
Author_Institution
Politecnico di Milano, Milan
fYear
2007
fDate
21-23 May 2007
Firstpage
360
Lastpage
365
Abstract
The PV plant at Politecnico di Milano represents the first installation under the national PV rooftops programme of Ministry of Environment in Italy. The role of this pilot plant has a significant importance in respect of the promotion and development of photovoltaic technology. The study and the design were made in detail not only to improve system productivity and efficiency, but also in respect of its visibility to illustrate a good example of the integration of photovoltaics into buildings. After five years of its operation, the monitored data and parameters represent an important benchmark to analyze the PV technology application.
Keywords
building integrated photovoltaics; Italian PV rooftop programme; PV technology; performance analysis; photovoltaic technology; Building integrated photovoltaics; Condition monitoring; Costs; Performance analysis; Photovoltaic systems; Power generation economics; Power grids; Production; Productivity; Solar power generation; PV efficiency; PV payback time; Performance Ratio; Photovoltaic;
fLanguage
English
Publisher
ieee
Conference_Titel
Clean Electrical Power, 2007. ICCEP '07. International Conference on
Conference_Location
Capri
Print_ISBN
1-4244-0632-3
Electronic_ISBN
1-4244-0632-3
Type
conf
DOI
10.1109/ICCEP.2007.384237
Filename
4272408
Link To Document