• DocumentCode
    3045862
  • Title

    Discussions on tower base design principles and geological conditions from Budongquan to Fenghuo mountain in the project of ± 400 KV AC-DC network in Qinghai-Tibet plateau

  • Author

    Zhu, Zhaorong ; Han, Longwu

  • Author_Institution
    Northwest Res. Inst. Corp., Ltd., China Railway Group., Lanzhou, China
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    1030
  • Lastpage
    1033
  • Abstract
    400 KV AC-DC Network project in Qinghai and Tibet is one of the national key projects, it is located in the highest latitude in the world up to now, and the largest power transmission project. This project has the total line length of 1038 km, and passes through 565km of perennial frozen soil, where construction is a globally technical problem. Budongquan-Fenghuo Mountain frozen soil area is in the hinterland of Qinghai-Tibet plateau. The unhealthy geological features in this area include high temperature, high ice content, perennial frozen soil, thick ground ice, ice picks, frost heave mounds, hot melt lakes and pools. The engineering complexity of perennial frozen soil makes a more serious damage to the project in the respect of frost and thaw damage than other seasonally frozen soil. This paper has analyzed and evaluated many elements in this area: the typography, climate, terrain lithology, geological structure, hydro logical conditions, the distribution of perennial frozen soil, the distribution of the ground temperature, ice content, etc. In addition, this paper also has also proposed the four tower base forms: pile foundation, prefabricated foundation, cone-cylinder foundation and pull "V" stand-alone tower base. All the research results provide adequate solutions to the basic problems in the transmission projects in perennial frozen soil areas and a guarantee to the secure and sustainable operation of the lines.
  • Keywords
    AC-DC power convertors; geophysical techniques; poles and towers; power transmission; AC-DC network project; Budongquan; Fenghuo mountain; Qinghai-Tibet plateau; climate; cone-cylinder foundation; engineering complexity; geological conditions; geological features; geological structure; hydrological conditions; perennial frozen soil; pile foundation; power transmission project; prefabricated foundation; terrain lithology; tower base design; typography; voltage 400 kV; Geology; Ice; Meteorology; Poles and towers; Presses; Rail transportation; Soil; AC-DC Network project; Perennial Frozen Soil; Qinghai-Tibet Plateau; Tower Base;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Multimedia Technology (ICMT), 2011 International Conference on
  • Conference_Location
    Hangzhou
  • Print_ISBN
    978-1-61284-771-9
  • Type

    conf

  • DOI
    10.1109/ICMT.2011.6002863
  • Filename
    6002863