Title :
Installation and monitoring experiences of the first synchronized measurement system in the brazilian national grid
Author :
Decker, C. ; Dotta, D. ; Agostini, M.N. ; Silva, A.S. ; Meyer, B.T. ; Zimath, S.L.
Author_Institution :
Fed. Univ. of Santa Catarina, Florianopolis
Abstract :
This paper describes recent results of the MedFasee-Eletrosul project aiming at the development and performance testing of a Wide Area Measurement System (WAMS) prototype and its applications for monitoring of power system operation. The prototype consists of a Phasor Data Concentrator (PDC) and four Phasor Measurement Units (PMUs) installed in the Eletrosul transmission system. The PMU, the PDC and the communication system are described as well as the main requirements and operational capability. The installation characteristics and the prototype performance are described. Applications for power flow and transmission line parameters calculations, frequency, phase angle and voltage monitoring and identification of eletromechanical oscillation modes, are presented.
Keywords :
installation; load flow; phase measurement; power grids; power system measurement; transmission network calculations; Brazilian National grid; MedFasee-Eletrosul project; WAMS; communication system; eletromechanical oscillation modes; installation characteristics; phasor measurement units; power flow; power system operation monitoring; transmission line parameter calculations; voltage monitoring; wide area measurement system; Frequency synchronization; Load flow; Monitoring; Phasor measurement units; Power system measurements; Power transmission lines; Prototypes; System testing; Voltage; Wide area measurements; PMU; Phasor Measurements; SPMS; WAMS; power system monitoring; wide-area monitoring;
Conference_Titel :
Transmission and Distribution Conference and Exposition: Latin America, 2008 IEEE/PES
Conference_Location :
Bogota
Print_ISBN :
978-1-4244-2217-3
Electronic_ISBN :
978-1-4244-2218-0
DOI :
10.1109/TDC-LA.2008.4641695