DocumentCode
3048867
Title
Probabilistic based transmission planning and operation criteria development for the Western Systems Coordinating Council
Author
Beshir, Mohammed J.
Author_Institution
Los Angeles Dept. of Water & Power, Los Angeles, CA, USA
Volume
1
fYear
1999
fDate
18-22 Jul 1999
Firstpage
134
Abstract
As the electric power industry restructures, the way system reliability is measured and compliance is monitored need to be revamped. The existing deterministic based reliability criteria need to be changed to accommodate probabilistic methods. Probabilistic methods are characteristically required to provide capability for value and economic based risk management decisions. This paper presents the reliability criteria revamping approach and the development activities underway to provide probabilistic based reliability criteria in WSCC. The WSCC development process is staged in four phases. Phase I development work is described in detail in this paper. Other reliability related issues underway within the WSCC are also briefly discussed in the paper
Keywords
electricity supply industry; power transmission planning; power transmission reliability; probability; risk management; Western Systems Coordinating Council; economic based risk management decisions; electric power industry restructuring; power system reliability compliance monitoring; power system reliability measurement; probabilistic based transmission operation; probabilistic based transmission planning; reliability related issues; value based risk management decisions; Councils; Decision making; Electric variables measurement; Integrated circuit interconnections; Monitoring; Power measurement; Power system interconnection; Power system planning; Power system reliability; Risk management;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Summer Meeting, 1999. IEEE
Conference_Location
Edmonton, Alta.
Print_ISBN
0-7803-5569-5
Type
conf
DOI
10.1109/PESS.1999.784334
Filename
784334
Link To Document