• DocumentCode
    304899
  • Title

    The operational experience of the first 400 kV feeder in the Southern African power pool

  • Author

    Coetzee, M.C. ; Muller, D. ; Hurford, G.J.

  • Author_Institution
    Syst. Oper., Eskom, Germiston, South Africa
  • Volume
    1
  • fYear
    1996
  • fDate
    24-27 Sep 1996
  • Firstpage
    48
  • Abstract
    This paper summarises the operational experiences of the first 400 kV tie line in the Southern African power pool (SAPP). This tie line interconnects the Northern utilities of the SAPP with the Southern utilities. This paper deals with the commissioning problems experienced initially and the operational experience gained
  • Keywords
    commissioning; electricity supply industry; power system interconnection; power transmission lines; project engineering; 400 kV; Southern African power pool; commissioning problems; electric utilities; feeder; interconnected power system; operational experience; tie line; Africa; Inductors; Interconnected systems; Load flow; Power generation; Power markets; Power system interconnection; Shunt (electrical); Steady-state; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AFRICON, 1996., IEEE AFRICON 4th
  • Conference_Location
    Stellenbosch
  • Print_ISBN
    0-7803-3019-6
  • Type

    conf

  • DOI
    10.1109/AFRCON.1996.563077
  • Filename
    563077