Transmission grid refurbishment project on the Zimbabwe Electricity Supply Authority (ZESA) high voltage power network
Author :
Masawi, Francis
Author_Institution :
Transmission Bus., Zimbabwe Electr. Supply Authority, Harare, Zimbabwe
Volume :
1
fYear :
1996
fDate :
24-27 Sep 1996
Firstpage :
52
Abstract :
Transmission grid refurbishment is not an easy thing to do considering the fact that the exercise does not result in an increase in revenue since the same power flows through the refurbished equipment as through the old system. The traditional methods of justifying the project on return on investment basis are therefore not easy to apply in motivating for transmission grid refurbishment. This paper presents an alternative method based on lifetime assessment and attempts to answer the question on how long should electric utilities sweat their assets before embarking on asset replacement. The method was successfully applied on the Zimbabwean ZESA transmission grid resulting in a phased approach to the refurbishment exercise
Keywords :
electricity supply industry; maintenance engineering; project engineering; transmission networks; Transmission grid refurbishment project; Zimbabwe Electricity Supply Authority; asset replacement; electric utilities; high voltage power network; lifetime assessment; power flow; return on investment; Availability; Circuit breakers; Circuit faults; Costs; Investments; Load flow; Maintenance; Petroleum; Power generation; Substations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
AFRICON, 1996., IEEE AFRICON 4th
Conference_Location :
Stellenbosch
Print_ISBN :
0-7803-3019-6
Type :
conf
DOI :
10.1109/AFRCON.1996.563078
Filename :
563078
Link To Document :
بازگشت