DocumentCode :
3049927
Title :
Petri net and GASA based approach for FSP with multi-workstation operation
Author :
Yang, Meng ; Tao, Ze
Author_Institution :
Sch. of Mech. Eng., Shenyang Ligong Univ., Shenyang, China
fYear :
2010
fDate :
20-23 June 2010
Firstpage :
234
Lastpage :
239
Abstract :
A new flow shop scheduling problem (FSP) is studied, which is abstracted from the auto assemble workshop. The problem is characterized by multi-workstation operation and stopping line operation, and fluctuant processing time. So the problem is very complicated. Firstly, the math model of this scheduling problem is constructed, and then the Petri net model is constructed based on the math model. The scheduling results are obtained based on hybrid algorithm of genetic algorithm and simulated annealing algorithm (GASA) with minimizing the completion time as function objective. Lastly, testing and analyzing the performance of scheduling results through 2D animation simulation. The effectiveness of this method is tested on the real data from the assemble workshop in an auto factory in Beijing.
Keywords :
Petri nets; flow shop scheduling; genetic algorithms; simulated annealing; FSP; GASA based approach; Petri net; auto assemble workshop; flow shop scheduling problem; fluctuant processing time; genetic algorithm and simulated annealing algorithm; math model; multiworkstation operation; Analytical models; Animation; Assembly; Genetic algorithms; Job shop scheduling; Performance analysis; Production facilities; Scheduling algorithm; Simulated annealing; Testing; Petri net; fluctuant processing time; hybrid genetic algorithm; multi-workstation operation; stopping line operation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information and Automation (ICIA), 2010 IEEE International Conference on
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-5701-4
Type :
conf
DOI :
10.1109/ICINFA.2010.5512365
Filename :
5512365
Link To Document :
بازگشت