DocumentCode :
3053006
Title :
The study of start-up process of automobile wastewater treatment by EGSB reactor
Author :
MA, Xingguan ; Wen, Jing ; Cui, Wei ; Chen, Chen ; Ming, Tieshan
Author_Institution :
Sch. of Municipal & Environ. Eng., Shenyang Jianzhu Univ., Shenyang, China
fYear :
2011
fDate :
26-28 July 2011
Firstpage :
1852
Lastpage :
1855
Abstract :
This paper studied the start-up process of integrated wastewater of automobile production. It supplies basic for start up process quickly of EGSB reactor in the future and ensure the reactor run stably. Control temperature of the reactor is 35±2°C . Anaerobic granular sludge for the test is from sewage treatment plant of Jiujiang distillery. The result is anaerobic granular sludge gradually be acclimated successfully in 59 days and finished start-up process of integrated wastewater of automobile production, the organic load (by the value of CODCr) is 4.03kg/(m3·d) and CODCr removal rate is more then 80%.
Keywords :
automobile manufacture; chemical reactors; sewage treatment; sludge treatment; wastewater treatment; EGSB reactor; Jiujiang distillery; anaerobic granular sludge; automobile production; automobile wastewater treatment; integrated wastewater; organic load; sewage treatment plant; start-up process; time 59 day; Automobiles; Filtration; Inductors; Sugar; Wastewater; Wastewater treatment; EGSB; Start-up Process; Wastewater of Automobile Production;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location :
Hangzhou
Print_ISBN :
978-1-61284-771-9
Type :
conf
DOI :
10.1109/ICMT.2011.6003212
Filename :
6003212
Link To Document :
بازگشت