• DocumentCode
    3053006
  • Title

    The study of start-up process of automobile wastewater treatment by EGSB reactor

  • Author

    MA, Xingguan ; Wen, Jing ; Cui, Wei ; Chen, Chen ; Ming, Tieshan

  • Author_Institution
    Sch. of Municipal & Environ. Eng., Shenyang Jianzhu Univ., Shenyang, China
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    1852
  • Lastpage
    1855
  • Abstract
    This paper studied the start-up process of integrated wastewater of automobile production. It supplies basic for start up process quickly of EGSB reactor in the future and ensure the reactor run stably. Control temperature of the reactor is 35±2°C . Anaerobic granular sludge for the test is from sewage treatment plant of Jiujiang distillery. The result is anaerobic granular sludge gradually be acclimated successfully in 59 days and finished start-up process of integrated wastewater of automobile production, the organic load (by the value of CODCr) is 4.03kg/(m3·d) and CODCr removal rate is more then 80%.
  • Keywords
    automobile manufacture; chemical reactors; sewage treatment; sludge treatment; wastewater treatment; EGSB reactor; Jiujiang distillery; anaerobic granular sludge; automobile production; automobile wastewater treatment; integrated wastewater; organic load; sewage treatment plant; start-up process; time 59 day; Automobiles; Filtration; Inductors; Sugar; Wastewater; Wastewater treatment; EGSB; Start-up Process; Wastewater of Automobile Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Multimedia Technology (ICMT), 2011 International Conference on
  • Conference_Location
    Hangzhou
  • Print_ISBN
    978-1-61284-771-9
  • Type

    conf

  • DOI
    10.1109/ICMT.2011.6003212
  • Filename
    6003212