The study of start-up process of automobile wastewater treatment by EGSB reactor
Author
MA, Xingguan ; Wen, Jing ; Cui, Wei ; Chen, Chen ; Ming, Tieshan
Author_Institution
Sch. of Municipal & Environ. Eng., Shenyang Jianzhu Univ., Shenyang, China
fYear
2011
fDate
26-28 July 2011
Firstpage
1852
Lastpage
1855
Abstract
This paper studied the start-up process of integrated wastewater of automobile production. It supplies basic for start up process quickly of EGSB reactor in the future and ensure the reactor run stably. Control temperature of the reactor is 35±2°C . Anaerobic granular sludge for the test is from sewage treatment plant of Jiujiang distillery. The result is anaerobic granular sludge gradually be acclimated successfully in 59 days and finished start-up process of integrated wastewater of automobile production, the organic load (by the value of CODCr) is 4.03kg/(m3·d) and CODCr removal rate is more then 80%.
Keywords
automobile manufacture; chemical reactors; sewage treatment; sludge treatment; wastewater treatment; EGSB reactor; Jiujiang distillery; anaerobic granular sludge; automobile production; automobile wastewater treatment; integrated wastewater; organic load; sewage treatment plant; start-up process; time 59 day; Automobiles; Filtration; Inductors; Sugar; Wastewater; Wastewater treatment; EGSB; Start-up Process; Wastewater of Automobile Production;
fLanguage
English
Publisher
ieee
Conference_Titel
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location
Hangzhou
Print_ISBN
978-1-61284-771-9
Type
conf
DOI
10.1109/ICMT.2011.6003212
Filename
6003212
Link To Document