Title :
Surcharse precompression processing technique of the C Port cargo area for the low infiltration & deep thick silty
Author :
Zhang, Yonghong ; Sun, Yaodong ; Li, Xinhua
Author_Institution :
Dept. of Civil Eng., Huaihai Inst. of Technol., Lianyungang, China
Abstract :
Lianyungang Jingangwan international logistics park is constructed in the coastal soft soil, the freight traffic loads is large, high demands is must to the Port cargo area. For consultation in the soft soil in the economy of Port cargo area works, "Plastic drainage board and preloading" are used to processing the soft soil of the C Port cargo area, combined with the researches, Proved this method is reasonable and effective. We not only guaranteed the quantity of the reconstruction project, and the cost is lower that the budget. In this article we will share our experiences and techniques.
Keywords :
geotechnical engineering; logistics; soil; Lianyungang Jingangwan international logistics park; coastal soft soil; freight traffic; infiltration; plastic drainage board; port cargo area; preloading; reconstruction project; surcharse precompression; Civil engineering; Floods; Logistics; Monitoring; Plastics; Soil; Telecommunication traffic; plastic draining water board; soft soil of Port cargo area; surcharse precompression;
Conference_Titel :
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location :
Hangzhou
Print_ISBN :
978-1-61284-771-9
DOI :
10.1109/ICMT.2011.6003346