Title :
Analysis construction method of double-decked electric power tunnel
Author :
Wang, Xinxia ; Su, Liping ; Wang, Jian
Author_Institution :
Sch. of Civil Eng. & Traffic, Beijing Univ. of Civil Eng. & Archit., Beijing, China
Abstract :
With the development of modern technology and space, more and more cities begin exploit underground space, to satisfy the increasingly crowded environment. This article base on double-decked electric power tunnel of 220KV 1 cut change project, use the finite element software MIDAS/GTS analysis and simulation the project construction process of two different method, through all the simulation of construction process, and analysis the engineering the feasibility construction method.lt is the first time use the double-decked tunnel construction methods in Beijing, to discuss and analysis the method of the project have an important significance, in the meanwhile, it can provide some references to similar project construction.
Keywords :
finite element analysis; geotechnical engineering; power plants; project management; structural engineering; tunnels; MIDAS GTS analysis; double decked electric power tunnel construction method; finite element software; project construction process; Analytical models; Concrete; Force; Plastics; Roads; Soil; Stress; double-decked tunnel; model analysis; simulation of construction´s process; subsidence displacement;
Conference_Titel :
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location :
Hangzhou
Print_ISBN :
978-1-61284-771-9
DOI :
10.1109/ICMT.2011.6003354