DocumentCode
3056022
Title
Analysis construction method of double-decked electric power tunnel
Author
Wang, Xinxia ; Su, Liping ; Wang, Jian
Author_Institution
Sch. of Civil Eng. & Traffic, Beijing Univ. of Civil Eng. & Archit., Beijing, China
fYear
2011
fDate
26-28 July 2011
Firstpage
4301
Lastpage
4306
Abstract
With the development of modern technology and space, more and more cities begin exploit underground space, to satisfy the increasingly crowded environment. This article base on double-decked electric power tunnel of 220KV 1 cut change project, use the finite element software MIDAS/GTS analysis and simulation the project construction process of two different method, through all the simulation of construction process, and analysis the engineering the feasibility construction method.lt is the first time use the double-decked tunnel construction methods in Beijing, to discuss and analysis the method of the project have an important significance, in the meanwhile, it can provide some references to similar project construction.
Keywords
finite element analysis; geotechnical engineering; power plants; project management; structural engineering; tunnels; MIDAS GTS analysis; double decked electric power tunnel construction method; finite element software; project construction process; Analytical models; Concrete; Force; Plastics; Roads; Soil; Stress; double-decked tunnel; model analysis; simulation of construction´s process; subsidence displacement;
fLanguage
English
Publisher
ieee
Conference_Titel
Multimedia Technology (ICMT), 2011 International Conference on
Conference_Location
Hangzhou
Print_ISBN
978-1-61284-771-9
Type
conf
DOI
10.1109/ICMT.2011.6003354
Filename
6003354
Link To Document