• DocumentCode
    306414
  • Title

    On some single-machine scheduling with sequence-dependent set-up times

  • Author

    Zhang, Lei ; Weimin Zheng

  • Author_Institution
    Inst. of Syst. Eng., Tsinghua Univ., Beijing, China
  • Volume
    2
  • fYear
    1996
  • fDate
    14-17 Oct 1996
  • Firstpage
    1162
  • Abstract
    In machine scheduling problems one of the important versions is the single-machine scheduling. The single-machine plus single-criterion is its simplest and most typical one including many famous NP-complete or -hard problems. With the single-criterion usually taking makespan as a popular choice, the single-machine deals with N jobs whose setup times are dependent or independent on the job sequences. Some single-machines with sequence-dependent setup times have been be transformed into the travelling salesman problem (1-TSP) in the literature, whereas in this paper one of its versions is reduced into the k-travelling salesman problem (k-TSP), an extension of the 1-TSP
  • Keywords
    computational complexity; production control; transforms; travelling salesman problems; NP-complete problem; job sequences; production control; sequence-dependent setup times; single-criterion; single-machine scheduling; travelling salesman problem; Cities and towns; Polynomials; Single machine scheduling; Systems engineering and theory; Traveling salesman problems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1996., IEEE International Conference on
  • Conference_Location
    Beijing
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-3280-6
  • Type

    conf

  • DOI
    10.1109/ICSMC.1996.571250
  • Filename
    571250