DocumentCode :
3065905
Title :
A Multi-agent System for the Flexible Resource Constrained Project Scheduling
Author :
Liu, Jingjing ; Wu, Bing
Author_Institution :
Wuhan Polytech. Univ., Wuhan
Volume :
2
fYear :
2007
fDate :
26-28 Nov. 2007
Firstpage :
321
Lastpage :
324
Abstract :
The resource constrained project scheduling problem (RCPSP) is extended to flexible resource constrained project scheduling problem (FRCPSP) in this paper. Resources are assumed to have certain capabilities demanded by project activities, but not necessarily all of them. Resource capability matrix (RCM) is proposed to represent flexible resources. A multi-agent system composed of resource agent, activity agent, and service agent is put forward as an information infrastructure to support flexible resource constrained project management in a highly distributed environment. The definitions of component agents and the strategies of flexible resource allocation are discussed.
Keywords :
multi-agent systems; scheduling; flexible resource constrained project scheduling problem; multiagent system; resource capability matrix; Civil engineering; Costs; Investments; Mathematical programming; Multiagent systems; Processor scheduling; Project management; Resource management; System performance; Technology management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Information Hiding and Multimedia Signal Processing, 2007. IIHMSP 2007. Third International Conference on
Conference_Location :
Kaohsiung
Print_ISBN :
978-0-7695-2994-1
Type :
conf
DOI :
10.1109/IIH-MSP.2007.33
Filename :
4457715
Link To Document :
بازگشت