DocumentCode :
3066014
Title :
Instrumentation and data acquisition techniques for development of predictive maintenance of load tap changers
Author :
Montgomery, M.W. ; Rastgoufard, Parviz
Author_Institution :
Dept. of Electr. Eng. & Comput. Eng., Tulane Univ., New Orleans, LA, USA
fYear :
1998
fDate :
8-10 Mar 1998
Firstpage :
220
Lastpage :
224
Abstract :
As the electric utility industry moves closer to deregulation and competition, the pressure to reduce maintenance costs becomes more and more imperative. One such maintenance cost is the labor and material intensive overhaul procedures often used in the preventive maintenance of power transformer load tap changers (LTCs). This paper outlines an invasive instrumentation scheme to monitor the operation of LTCs, detecting imminent failures and eliminating unnecessary preventive maintenance expenditures
Keywords :
data acquisition; instrumentation; maintenance engineering; monitoring; power transformer testing; data acquisition techniques; electric utility industry; instrumentation techniques; power transformer load tap changers; predictive maintenance; Condition monitoring; Costs; Data acquisition; Instruments; Oil insulation; Power transformers; Predictive maintenance; Preventive maintenance; Substations; Vibration measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
System Theory, 1998. Proceedings of the Thirtieth Southeastern Symposium on
Conference_Location :
Morgantown, WV
ISSN :
0094-2898
Print_ISBN :
0-7803-4547-9
Type :
conf
DOI :
10.1109/SSST.1998.660052
Filename :
660052
Link To Document :
بازگشت