DocumentCode :
3066807
Title :
Justifying upgrade projects in existing mills
Author :
Hung, Oliver K. ; Klimach, Ben
Author_Institution :
Universal Dynamics Ltd., Vancouver, BC, Canada
fYear :
1995
fDate :
12-16 June 1995
Firstpage :
165
Lastpage :
169
Abstract :
This paper describes the various potential benefits for upgrading existing paper mill electrical and control systems beyond the usual justifications of manpower savings, production cost savings and directly measurable operating and maintenance cost savings. Using examples from upgrades of power systems, drive systems, and control instrumentation systems, the authors describe the various ways that reliability, product quality, and other sometimes intangible benefits can be expressed in dollar terms that management understands. The examples include upgrading a plant water supply electrical system justified on improved reliability and shutdown avoidance and the justification of instrument/control upgrades based on increased "on-grade" pulp production.<>
Keywords :
economics; industrial power systems; maintenance engineering; management; motor drives; paper industry; power system control; process control; project engineering; control instrumentation systems; drive systems; maintenance cost savings; management; manpower savings; paper mill; power systems; product quality; production cost savings; reliability; shutdown avoidance; upgrade projects; water supply electrical system; Control systems; Costs; Electric variables measurement; Instruments; Maintenance; Milling machines; Paper mills; Power system management; Power system reliability; Production systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulp and Paper Industry Technical Conference, 1995., Conference Record of 1995 Annual
Conference_Location :
Vancouver, BC, Canada
Print_ISBN :
0-7803-2418-8
Type :
conf
DOI :
10.1109/PAPCON.1995.404836
Filename :
404836
Link To Document :
بازگشت