DocumentCode
3067548
Title
Steam power plant repowering to provide black-start ancillary service and speed up power system restoration
Author
Delfino, B. ; Denegri, G.B. ; Invernizzi, M.
Author_Institution
Dept. of Electr. Eng., Genoa Univ., Italy
Volume
4
fYear
2003
fDate
23-26 June 2003
Abstract
Power system restoration via repowered plants has been considered to compare it with present operating solutions, frequently committing remote hydro or combustion black-start generators. After detailing about specific modeling of prime movers for start-up procedures, extensive simulations are here reported to highlight main characteristics of the various restoration phases. The obtained results suggest providing repowered plants with black-start capability, thus allowing a quicker and more secure recovery of large strategic thermal units. A reconsideration of present restoration plan guidelines appears in the end advisable.
Keywords
combustion; gas turbines; power system restoration; power system simulation; steam power stations; black-start ancillary service; combustion black-start generator; hydro black-start generator; power system modeling; power system restoration; prime mover; repowered plant; steam power plant; thermal power generation; thermal unit; Combustion; Costs; Europe; Mesh generation; Power generation; Power system modeling; Power system restoration; Power system simulation; Testing; Turbines;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Tech Conference Proceedings, 2003 IEEE Bologna
Print_ISBN
0-7803-7967-5
Type
conf
DOI
10.1109/PTC.2003.1304728
Filename
1304728
Link To Document